Cherry Valley, IL 61016,515 STONE RIDGE LN
Cherry Valley, IL 61016,515 STONE RIDGE LN
Cherry Valley, IL 61016,515 STONE RIDGE LN
Cherry Valley, IL 61016,515 STONE RIDGE LN
Cherry Valley, IL 61016,515 STONE RIDGE LN
Cherry Valley, IL 61016,515 STONE RIDGE LN
REQUEST A TOUR If you would like to see this home without being there in person, select the "Virtual Tour" option and your agent will contact you to discuss available opportunities.
In-PersonVirtual Tour
Sat
26
Jul
Sun
27
Jul
Mon
28
Jul
$ 799,900
Est. payment | /mo

4 Beds

4.5 Baths

2,500 SqFt


Save
$ 799,900
Est. payment | /mo
Save

4 Beds

4.5 Baths

2,500 SqFt

Key Details

Property Type Single Family Home

Sub Type Detached Single

Listing Status Active

Purchase Type For Sale

Square Footage 2,500 sqft

Price per Sqft $319

MLS Listing ID 12385738

Bedrooms 4

Full Baths 4

Half Baths 1

HOA Fees $1,485/ann

Year Built 2006

Annual Tax Amount $20,166

Tax Year 2024

Lot Size 0.760 Acres

Lot Dimensions 119X120X252X293

Property Sub-Type Detached Single

Property Description

Tucked away on a quiet, private lane, this custom built, contemporary brick ranch is a true masterpiece and designed for both everyday tranquility and inspired entertaining. Perched above the Kishwaukee River with uninterrupted views of protected conservation land, this home offers a daily escape that feels more like a retreat than a residence. From the moment you step inside, you are greeted by a dramatic wall of cantilevered windows that flood the space with natural light and showcase professionally landscaped grounds and panoramic river views. The open concept Great Room features a striking sandstone fireplace and flows effortlessly into a sleek modern kitchen, highlighted by a teak island, chef-sized walk in pantry and high end finishes throughout. Craftsmanship abounds with strand woven bamboo flooring, solid hickory doors and exceptional woodwork throughout the main floor which offers four bedrooms. The spacious primary suite has built in drawers and a walk in closet. The large three season room off the kitchen offers year round enjoyment. The full walk out lower level is designed to impress with a custom wrap around bar, wine cellar, steam shower and additional bedrooms, one with built in bunk beds. A home office and fitness room included and offer ample space and flexibility for living, hosting and relaxing. Enjoy outdoor living at its best on the expansive deck and patio spaces. Generous storage and a 3 car tandem garage with stairs to the basement. Across the street is a private shared prairie which enhances the peaceful setting while the unspoiled views across the river which are permanently preserved by conservation land, complete this rare property. Close to Rockford, IL.

Location

State IL

County Winnebago

Area Cherry Valley / Irene

Rooms

Basement Finished, Full, Walk-Out Access

Interior

Heating Natural Gas

Cooling Central Air

Fireplace N

Exterior

Garage Spaces 3.0

Building

Dwelling Type Detached Single

Building Description Brick, No

Sewer Public Sewer

Water Public

Structure Type Brick

New Construction false

Schools

School District 100 , 100, 100

Others

HOA Fee Include Other

Ownership Fee Simple

Special Listing Condition None

Midwest Real Estate Data (MRED) IDX
Listed by Diane Dowd • Dickerson & Nieman Realtors - Rockford
agent-avatar

Making real estate fast, fun, and stress-free!

GET MORE INFORMATION

Name
Phone*
Message

Go tour this home

515 STONE RIDGE LN